QUESTİON AND ANSWERS

QUESTION : Where can we use electricity generated by solar energy?

ANSWER : Produced by the solar power it can be used in all areas of the energy needs.

QUESTION  : I can generate electricity with solar energy in my house?

ANSWER : Generating electricity with solar energy and environmental lighting in your home and you produce you can use all the electrical equipment in your home with energy possible. 

QUESTION : I can generate electricity with solar power in my workplace?

ANSWER : All electrical equipment and lighting with the energy that you produce in your environment to produce electricity with solar energy you can use in your workplace and workplace possible. 

QUESTION : Mountains at my house, I can produce electricity with solar energy?

ANSWER : Nature in your home with solar energy to produce electricity and mountains all electrical equipment in your home and you can use the energy you produce your lighting environment possible. 

QUESTION : What you can do with the energy produced?

ANSWER : There is no technical limitation on the amount of energy produced by solar energy. To produce energy or power in any desired amount and you can use is possible. In all areas of the energy produced can be used with due relaxed and hassle-free. 

QUESTION : The electricity generated by solar energy, would damage the device I use?

ANSWER : Solar energy including electricity produced by high-tech means are used with inverters and controllers. The generated DC power is carried out with high efficiency and full cycle sine AC frequency energy that solar inverters. These types of inverters, refrigerators, television sets or sensitive electronic devices certainly does not hurt. not connected to the network, such as power fluctuations or noise issues because it is completely independent system of supply solar inverter absolutely not. 

QUESTION : Is that electricity generation on cloudy when it happens?

ANSWER : Solar electricity production is done by the sun's UV rays reaching the earth. Even if the earth cloudy weather, UV rays coming through the clouds allows us üretebilme electricity from sun up to sundown birth. 

QUESTION : Is there a difference between the electricity I use energy derived from the sun?

ANSWER : Obtained from the mains power, Turkey 220V 50Hz d in infrastructure. Energy generated by solar energy is exactly 220V and 50Hz is. This means that there is no difference between the electrical energy obtained from solar energy to electrical energy received from the network. 

QUESTION : What is the life of the solar energy in electricity production?

ANSWER : In general, you can use up the life of the solar modules, photovoltaic systems. 45-50 years life of the solar modules. Single network independent (off-grid) systems with battery life of less. Depending on the quality of batteries used is between 5-10 years. 

QUESTION : Is there damage to the environment of solar energy?

ANSWER : The structure of the electricity-generating solar modules, solar energy materials are silicon and quartz. In the lamination of solar modules, glass and aluminum are used. After all the products used in the production process and production materials are totally unsuitable for recycling. Energy in the production process, is used when solar modules are certainly no gas or toxic substances. 

QUESTION : Who can install the unlicensed electrical plants?

ANSWER : Anyone with electricity subscriber, any natural or legal person may establish unlicensed electricity generation facilities. This person consumption of at least one plant in its possession, that must have a subscription. Subscription to people who do not, will not be able unlicensed electricity production plant. natural or legal persons who are not subscribers, such as apartment management will not be able unlicensed electricity production plant. 

QUESTION Is that unlicensed electricity production plants based on renewable energy sources can be installed? 

ANSWER : Yes, it can be installed. 

QUESTION Will be established on the basis of renewable energy sources for electricity production plant license is there an installed capacity limit?

ANSWER : Will be established on the basis of renewable energy sources in power generation plants can be installed up to 1 MW of power and can be connected to more than 1 MW system. It said unlicensed production of electricity for the facilities to be established under the micro limit is 100 Kwei. Besides, 6446 numbered Electricity Market Law of 14 without obtaining a license within the framework of the Article and companies without installing or other manufacturing plants, transmission and outside the limitations of the regulations regarding the connection of the distribution system, there is no upper limit power board to just be installed without a license. 

QUESTION Surplus electricity can be sold to whom the electricity produced in the establishment of unlicensed production plant based on renewable energy sources? Is there a limit on sale?

ANSWER : It will be established on the basis of renewable energy sources in electricity production plants up to 1 MW can be installed and connected in more than 1 MW of power to the system. Those limits for unlicensed electricity production to be established under the micro cogeneration plants 100 KW. Besides, 6446 numbered Electricity Market Law of 14 without obtaining a license within the framework of the Article and companies without installing or other manufacturing plants, transmission and outside the limitations of the regulations regarding the connection of the distribution system, there is no upper limit power board to just be installed without a license. 

QUESTION : To install unlicensed electricity production facility, where you need to apply?

ANSWER : Unlicensed electricity generation plant hydraulic desired, be established according to the source into the earth to set up a production plant in the Special Provincial Administration, or in places where there is no special provincial administrations Investment Monitoring and Coordination Directorate, if desired, be used in other resource distribution in the region to set up a production plant according to the interested company or OSB is made. 

QUESTION : Is it a person can establish more than one facility?

ANSWER : At a maximum of 1 MW if required to set up production facilities based on renewable energy sources can be set up for a subscription or a production facility can be established multiple manufacturing facilities total installed capacity of 1 MW to be. 

QUESTION : Can a person may establish separate production facilities in more than one delivery area? Is there a limit can be established in terms of installed capacity of these facilities?

ANSWER : A natural or legal person may have more than one subscription to the distribution area. In this context, the person concerned can establish power generation plants without a subscription license for each region in each distribution. renewable energy sources if it is based on one of these facilities 1 MW limit, if there is no microcogeneration 100 KW installed capacity limit. 

QUESTION : You will document requested that I make the right use of unlicensed electricity production source applications?

ANSWER : Unlicensed electricity production plant of the right to use the rule if it is based on one source of renewable energy sources should be provided that that document available. However, wind, solar, biomass and gas derived from biomass (including landfill gas), this document is not desirable for the production facilities will be established based. 

QUESTION : What should I do if requested unlicensed electricity production plant to be built on public land or forest areas considered?

ANSWER : Unlicensed electricity generation facilities of public, if desired, be installed in the treasury or forest land, that acquired the right to use the land according to the certificate required by the relevant legislation. In this context, to prepare legislation and practice is necessary to refer to the competent officials and institutions. But the public treasury or the forest in case of hydraulic production facilities of the plant will be built on land is not acquired the right to use the resources that have been allocated in another person the land in question, the resort area will be taken from the allocation to the competent authority, the land of another is not allocated and it made concerned by the application for allocation informs an official letter will be considered adequate at the application stage. 

QUESTION : Unlicensed electricity generation facility gives you information about the incentives provided by the government in the establishment?

ANSWER : Unlicensed electricity production facilities are established according to the scope of the Regulation and the Communiqué and facilities for this person who has been authorized to generate electricity for their own needs in these plants. establishing cogeneration plants of these people real and electrical energy produced by the person who set up manufacturing plants to consume legal persons without using the transmission and distribution system to produce the same bus be able to produce only for their own needs. and actual electricity they produce in excess of the needs of legal entities established based on renewable energy sources for 10 years, is considered under guard by the supply company of RES support mechanisms. In this context, I attached the schedule stipulated price basis is applied to the RES Act for renewable energy sources. For the system as surplus electricity produced by the natural or legal persons established micro cogeneration plants apply the lowest price in the same ruler. 

QUESTION : Wind and solar production that is the measure must have a license for power generation plants?

ANSWER : No its not. 

QUESTION : Unlicensed production facilities and energy generated from the system will be how to offset the surplus?

ANSWER : More needs to be given to systems manufactured in unlicensed production plant facilities with consumption of energy offsetting production facility that will be different in the absence or in the same place at the same place. Production facility with consumption facility at the same location on the board that the system of the surplus energy sided measurements to be measured on a daily basis through counters that daily consumption of daily output (to 24:00 as) will be deducted and if the resulting surplus (= surplus energy) amount of resources on the basis of designated support price of that day is written to the Central Bank US Dollar exchange rate on purchases producers will value obtained by multiplying the number of households to be found. For example, 60 kWh consumption of a home solar power plant installed on the roof in a day and 100 kWh to 40 kWh if surplus energy will be given to the system. According to (40 kWh x 0.133 US $ / kWh x 1.99TL / US $) = 10.59TL per day will be written in the household. Conversely if the person in this case was not my extra energy to 40 kWh of energy drawn from the system. This is accrued based on the amount of consumption of 40 kWh of energy available for subscription. These actions will result in the end of the month made individually for each day and accounts payable is determined. This amount is added to the process is finalized through the system usage fee. In case of different places of plant production facilities and consumption, and the energy supplied to the system are recorded separately from the system. The captured energy is offset against the energy delivered. The result is given or the system needs more energy or energy reached the conclusion drawn from the system. But in this case costs are applied separately to the energy supplied to and withdrawn from the system as well as system for system use. 

QUESTION : Unlicensed production facility is the person who offers a three-time subscriber consumption offsetting to be made for what period of time?

ANSWER : This will be assessed rather than separate accounts for each of the three times daily. So for one day, no account shall be made three accounts. 

QUESTION : Can you give information on loans and other financing opportunities for unlicensed electricity production facilities?

ANSWER 

Domestic and from foreign banks and financial institutions:

1.   Bank loans, 2 year grace period of 10 years maturity.

2.   Leasing up to 7 years deferred payment

The banks and financial institutions, especially Renewable Energy solutions are offered lower financing cost. All conditions of the feasibility of the project varies according to the investor's financial data.